  1. PW-011 Avenue A & Treatment Plant Road

    The Avenue A Street Improvement project consists of widening and reconstruction of Avenue A from Oak Street to just West of the Railroad tracks. The Treatment Plant Road project consists of reconstruction of Treatment Plant Road from Avenue A to the Wastewater Treatment Plant.

    Link to page
  2. PW-022 Elizabeth-Maple Street Paving 2016

    Link to page
  3. PW-024 Ash Street Partial Reconstruction 2016

    This is a Partial Reconstruction of Ash Street from Kansas Ave to the Railroad tracks just North of Euclid. This project consists of New ADA Ramps and Curb at Marlin and Euclid, New drainage improvements, and New Asphalt pavement throughout the 3 Blocks. This project is scheduled for construction in Late Summer of 2016

    Link to page
  4. KLINK 2015

    Kansas Dept of Transportation City Connecting Link "KLINK" Resurfacing Program. This is a Local Partnership Program. By combining resources, KDOT and the City of McPherson are making a difference in improving the State's Transportation System. This 2015 year, a Ultra-thin Bonded Asphalt Surfacing Overlay on US-56 Highway/Kansas Ave, From Maple St to Old 81 Highway/K-153 will be done.

    Link to page
  5. KLINK 2016

    This project is a Mill and Asphalt Overlay on K-153 (Old 81 Bypass) From Kansas Ave heading South to the South City Limits, just past Avenue A. This project will repave the entire width of the street and shoulders.

    Link to page
  6. CIP-0014 - Centennial Drive Widening 2016

    This project is a widening of Centennial Dr from Kansas Ave to the Railroad Tracks. This project will widen out Centennial to accommodate turning lanes for the Hampton Inn and and future building expansion on the West side of Centennial Dr by Midway Motors. This project consist of Bridge Extensions, New Pavement, New Sidewalk Accessibility, and New Drainage Upgrades

    Link to page
  7. Centennial Drive Sewer Improvements Phase II

    The project generally consists of an approximate total of 3,500 linear feet of sanitary sewer improvements. The location of these improvements include south from Pump Station No. 8 located on the south side of the K&O Railroad right-of-way to just north of the Union Pacific Railroad, then west along the north side of the Union Pacific Railroad right-of-way, then south crossing the Union Pacific Railroad right-of-way and ending just north of the Midway Motors Car Dealership.

    Link to page